Nidhiry, N.M.; Saravanan, R. (2014). Scheduling optimization of a flexible manufacturing system using a modified NSGA-II algorithm, Advances in Production Engineering & Management, Vol. 9, No. 3, 139–151, http://dx.doi.org/10.14743/apem2014.3.183.