Jiang, C.; Xi, J.T. (2019). Dynamic scheduling in the engineer-to-order (ETO) assembly process by the combined immune algorithm and simulated annealing method, Advances in Production Engineering & Management, Vol. 14, No. 3, 271-283, https://doi.org/10.14743/apem2019.3.327