Ojstersek, R.; Tang, M.; Buchmeister, B. (2020). Due date optimization in multi-objective scheduling of flexible job shop production, Advances in Production Engineering & Management, Vol. 15, No. 4, 481-492, https://doi.org/10.14743/apem2020.4.380