Home About APEM Events News Sponsorship
Advances in Production Engineering & Management

Archives > Volume 7 | Number 2 | Year 2012

Advances in Production Engineering & Management
Volume 7 | Number 2 | Year 2012 | pp 80–150

Contents
Evolutionary measurement-estimation method for micro, small and medium-sized enterprises based on estimation objects
Celar, S.; Vickovic, L.; Mudnic, E.
http://dx.doi.org/10.14743/apem2012.2.132
FULL ARTICLE TEXT (PDF)


Conception of universal extensometric cutting dynamometer
Bourdim, M.; Bourdim, A.; Benamar, A.
http://dx.doi.org/10.14743/apem2012.2.133
FULL ARTICLE TEXT (PDF)


Operation of waste-to-energy-plant optimisations by using design exploration
Kapitler, M.; Samec, N.; Kokalj, F.
http://dx.doi.org/10.14743/apem2012.2.134
FULL ARTICLE TEXT (PDF)


Optimizing the process parameters of ELID grinding using grey relation analysis
Babu Aurtherson, P.; Sundaram, S.; Sivapragash, M.; Shanawaz, A.M.
http://dx.doi.org/10.14743/apem2012.2.135
FULL ARTICLE TEXT (PDF)


System safety in LPG fired furnace – a multi criteria decision making technique
Georgekutty Mangalathu, S.; Siva Shanmugam, N.; Sankaranarayanasamy, K.; Ramesh, T.; Muthukumar, K.
http://dx.doi.org/10.14743/apem2012.2.136
FULL ARTICLE TEXT (PDF)


Study of feasibility of plastic gear to reduce noise in a gear pump
Metalsi Tani, F.; Bourdim, A.
http://dx.doi.org/10.14743/apem2012.2.137
FULL ARTICLE TEXT (PDF)

< PREVIOUS ISSUE   |   NEXT ISSUE >