Home About APEM Events News Sponsorship
Advances in Production Engineering & Management

Archives > Volume 14 | Number 3 | September 2019 > pp 333–342

Advances in Production Engineering & Management
Volume 14 | Number 3 | September 2019 | pp 333–342

https://doi.org/10.14743/apem2019.3.331

Multi-objective scheduling of cloud manufacturing resources through the integration of Cat swarm optimization and Firefly algorithm
Du, Y.; Wang, J.L.; Lei, L.
ABSTRACT AND REFERENCES (PDF)  |  FULL ARTICLE TEXT (PDF)

A B S T R A C T
This paper attempts to minimize the makespan and cost and balance the load rate of the process scheduling of cloud manufacturing resources. For this purpose, a multiobjective scheduling model was established to achieve the minimal makespan, minimal cost and balanced load rate. Next, the cat swarm optimization (CSO) and the firefly algorithm (FA) were combined into a hybrid multi-objective scheduling algorithm. Finally, the hybrid algorithm was verified through CloudSim simulation. The simulation results show that the algorithm output the optimal scheduling plan in a short time. This research not only provides an effective way to find the global optimal solution, within the shortest possible time, to the process scheduling problem of cloud manufacturing resources with multiple objectives, but also promotes the application of swarm intelligence algorithms in job-shop scheduling problems.

A R T I C L E   I N F O
Keywords • Cloud manufacturing; Multi-objective scheduling; Cat swarm optimization (CSO); Firefly algorithm (FA)
Corresponding authorDu, Y.
Article history • Received 2 August 2019, Revised 8 September 2019, Accepted 10 September 2019
Published on-line • 30 September 2019

E X P O R T   C I T A T I O N
» RIS format (EndNote, ProCite, RefWorks, and most other reference management software)
» BibTeX (JabRef, BibDesk, and other BibTeX-specific software)
» Plain text

< PREVIOUS PAPER   |   NEXT PAPER >